There’s been some great progress made this week! We have a tentative design that has been drawn by our resident Architectural Engineer Rediet for the house, and Dan created a CAD design of the drawing as well. Imisi has been making some good progress on the envelope of the home, while Lars has been able to find some interesting ways to save energy heating the home with the use of geothermal heat pumps and an energy-recovery ventilator for saving energy ventilating the home. Progress is going smoothly
Things are going well for our sustainable house. We are still working on electrical and heat loads, and some more confirming R-values and such, but these things are just about finalized and should be complete soon. We have started working on the Final Report Draft, which will be finished next week.